Aggregate

Grid List

Showing all 16 results

Ballast/Kokoto/1½”inch-38 mm-7 Tonnes

Ballast/Kokoto/1½”inch-38 mm-7 Tonnes
KSh17,800
Countdown Timer

Ballast/Kokoto/1½”inch-38 mm-7 Tonnes

Ballast/Kokoto/1½”inch-38 mm-7 Tonnes
KSh17,800

These are also refereed as aggregate. They are normally used in concrete to make shutter, slab, columns and beams and road construction or as desired by the client. It is sold in tonnage.

Ballast/Kokoto/1½”inch-38 mm-18Tonnes

Ballast/Kokoto/1½”inch-38 mm-18Tonnes
KSh33,200
Countdown Timer

Ballast/Kokoto/1½”inch-38 mm-18Tonnes

Ballast/Kokoto/1½”inch-38 mm-18Tonnes
KSh33,200

These are also refereed as aggregate They are normally used in concrete to make shutter, slab, columns and beams and road construction or as desired by the client. It is sold in tonnage.

Aggregates/Ballast/Kokoto/Gravel 1” inch-25 mm – 14 TONNES

Aggregates/Ballast/Kokoto/Gravel 1” inch-25 mm – 14 TONNES
KSh27,600
Countdown Timer

Aggregates/Ballast/Kokoto/Gravel 1” inch-25 mm – 14 TONNES

Aggregates/Ballast/Kokoto/Gravel 1” inch-25 mm – 14 TONNES
KSh27,600

These are also refereed as BALLAST/KOKOTO. They are normally used in concrete to make shutter, slab, columns and beams and road construction or as desired by the client. It is sold in tonnage.

Aggregates/Ballast/Kokoto/Gravel 1” inch-25 mm – 18 TONNES

Aggregates/Ballast/Kokoto/Gravel 1” inch-25 mm – 18 TONNES
KSh33,200
Countdown Timer

Aggregates/Ballast/Kokoto/Gravel 1” inch-25 mm – 18 TONNES

Aggregates/Ballast/Kokoto/Gravel 1” inch-25 mm – 18 TONNES
KSh33,200

These are also refereed as BALLAST/KOKOTO. They are normally used in concrete to make shutter, slab, columns and beams and road construction or as desired by the client. It is sold in tonnage.

Aggregates/Ballast/Kokoto/Gravel ¾” inch-18 mm – 7TONNES

Aggregates/Ballast/Kokoto/Gravel ¾” inch-18 mm – 7TONNES
KSh17,800
Countdown Timer

Aggregates/Ballast/Kokoto/Gravel ¾” inch-18 mm – 7TONNES

Aggregates/Ballast/Kokoto/Gravel ¾” inch-18 mm – 7TONNES
KSh17,800

These are also refereed as BALLAST/KOKOTO. They are normally used in concrete to make shutter, slab, columns and beams and road construction or as desired by the client. It is sold in tonnage.

Aggregates/Ballast/Kokoto/Gravel ¾” inch-18 mm – 14 TONNES

Aggregates/Ballast/Kokoto/Gravel ¾” inch-18 mm – 14 TONNES
KSh27,600
Countdown Timer

Aggregates/Ballast/Kokoto/Gravel ¾” inch-18 mm – 14 TONNES

Aggregates/Ballast/Kokoto/Gravel ¾” inch-18 mm – 14 TONNES
KSh27,600

These are also refereed as BALLAST/KOKOTO. They are normally used in concrete to make shutter, slab, columns and beams and road construction or as desired by the client. It is sold in tonnage.

Aggregates/Ballast/Kokoto/Gravel ¾” inch-18 mm – 18 TONNES

Aggregates/Ballast/Kokoto/Gravel ¾” inch-18 mm – 18 TONNES
KSh33,200
Countdown Timer

Aggregates/Ballast/Kokoto/Gravel ¾” inch-18 mm – 18 TONNES

Aggregates/Ballast/Kokoto/Gravel ¾” inch-18 mm – 18 TONNES
KSh33,200

These are also refereed as BALLAST/KOKOTO. They are normally used in concrete to make shutter, slab, columns and beams and road construction or as desired by the client. It is sold in tonnage.

Aggregates/Ballast/Kokoto/Gravel ½” inch-12 mm – 7 TONNES

Aggregates/Ballast/Kokoto/Gravel ½” inch-12 mm – 7 TONNES
KSh17,800
Countdown Timer

Aggregates/Ballast/Kokoto/Gravel ½” inch-12 mm – 7 TONNES

Aggregates/Ballast/Kokoto/Gravel ½” inch-12 mm – 7 TONNES
KSh17,800

These are also refereed as BALLAST/KOKOTO. They are normally used in concrete to make shutter, slab, columns and beams and road construction or as desired by the client. It is sold in tonnage.

Aggregates/Ballast/Kokoto/Gravel ½” inch-12 mm – 14 TONNES

Aggregates/Ballast/Kokoto/Gravel ½” inch-12 mm – 14 TONNES
KSh27,600
Countdown Timer

Aggregates/Ballast/Kokoto/Gravel ½” inch-12 mm – 14 TONNES

Aggregates/Ballast/Kokoto/Gravel ½” inch-12 mm – 14 TONNES
KSh27,600

These are also refereed as BALLAST/KOKOTO. They are normally used in concrete to make shutter, slab, columns and beams and road construction or as desired by the client. It is sold in tonnage.

Aggregates/Ballast/Kokoto/Gravel ½” inch-12 mm – 18 TONNES

Aggregates/Ballast/Kokoto/Gravel ½” inch-12 mm – 18 TONNES
KSh33,200
Countdown Timer

Aggregates/Ballast/Kokoto/Gravel ½” inch-12 mm – 18 TONNES

Aggregates/Ballast/Kokoto/Gravel ½” inch-12 mm – 18 TONNES
KSh33,200

These are also refereed as BALLAST/KOKOTO. They are normally used in concrete to make shutter, slab, columns and beams and road construction or as desired by the client. It is sold in tonnage.

Aggregates/Ballast/Kokoto/Gravel ¼” inch- 6 mm – 7 TONNES

Aggregates/Ballast/Kokoto/Gravel ¼” inch- 6 mm – 7 TONNES
KSh16,400
Countdown Timer

Aggregates/Ballast/Kokoto/Gravel ¼” inch- 6 mm – 7 TONNES

Aggregates/Ballast/Kokoto/Gravel ¼” inch- 6 mm – 7 TONNES
KSh16,400

These are also refereed as BALLAST/KOKOTO. They are normally used in concrete to make shutter, slab, columns and beams and road construction or as desired by the client. It is sold in tonnage.

Aggregates/Ballast/Kokoto/Gravel ¼” inch- 6 mm – 14 TONNES

Aggregates/Ballast/Kokoto/Gravel ¼” inch- 6 mm – 14 TONNES
KSh24,800
Countdown Timer

Aggregates/Ballast/Kokoto/Gravel ¼” inch- 6 mm – 14 TONNES

Aggregates/Ballast/Kokoto/Gravel ¼” inch- 6 mm – 14 TONNES
KSh24,800

These are also refereed as BALLAST/KOKOTO. They are normally used in concrete to make shutter, slab, columns and beams and road construction or as desired by the client. It is sold in tonnage.

Aggregates/Ballast/Kokoto/Gravel ¼” inch- 6 mm – 18 TONNES

Aggregates/Ballast/Kokoto/Gravel ¼” inch- 6 mm – 18 TONNES
KSh29,600
Countdown Timer

Aggregates/Ballast/Kokoto/Gravel ¼” inch- 6 mm – 18 TONNES

Aggregates/Ballast/Kokoto/Gravel ¼” inch- 6 mm – 18 TONNES
KSh29,600

These are also refereed as BALLAST/KOKOTO. They are normally used in concrete to make shutter, slab, columns and beams and road construction or as desired by the client. It is sold in tonnage.

Quarry Dust/Vumbi- 7 TONNES

Quarry Dust/Vumbi- 7 TONNES
KSh8,600
Countdown Timer

Quarry Dust/Vumbi- 7 TONNES

Quarry Dust/Vumbi- 7 TONNES
KSh8,600

Used to lay cabros or as desire  by the client

Quarry Dust/Vumbi- 14 TONNES

Quarry Dust/Vumbi- 14 TONNES
KSh14,200
Countdown Timer

Quarry Dust/Vumbi- 14 TONNES

Quarry Dust/Vumbi- 14 TONNES
KSh14,200

used to lay cabros or as desire.

Quarry Dust/Vumbi- 18 TONNES

Quarry Dust/Vumbi- 18 TONNES
KSh17,400
Countdown Timer

Quarry Dust/Vumbi- 18 TONNES

Quarry Dust/Vumbi- 18 TONNES
KSh17,400

used to lay cabros or as desire.